I spent too much of my career focusing on the wrong things. When I started as a young lawyer in a large law firm, we focused on the front part of the agreement and ignored the schedule that set out the obligations. That part wasn't "legal".
As technology advanced, the schedule became schedules, each with rows of detailed obligations, often pasted straight from a spreadsheet. They clearly mattered more, but they were too long to process, unclearly written and hard to edit.
CLM systems promised a lot but often failed to deliver. Most of the obligations extracted, if that happened at all, were inputs rather than outcomes, and irrelevant to whether the contract succeeded. Tracking and micromanaging what can be measured takes focus away from what really matters.
What I understand now is that the outcome is what matters. We need fewer obligations, but better ones. And even though AI is now an audience for contract drafting, we still need to write clearly for the humans who should remain at the centre of the contractual relationship. That's the argument I make in the article below.
This article was first published by World Commerce & Contracting in the Contracting Excellence Journal on 8 October 2026. You can read the original on the WorldCC website.
There’s a comfortable assumption behind a lot of contract technology: that the problem with contracts is gaps. Something important was left out. Find the missing obligations and performance improves.
I don’t think that’s usually the problem, and neither, on the evidence, does WorldCC.
Start with volume. WorldCC’s Ten Pitfalls1 research notes that many contracts today contain - quite literally - several thousand obligations, and that extracting them from the contract is itself a major task. Nobody is short of things to comply with.
Now the readability problem. In the same research, more than 90% of business people admit they find contracts hard to understand and have difficulty finding relevant information. Two key causes are that:
- contracts are often designed by lawyers, to serve the purpose of lawyers, in anticipation of possible litigation; and.
- because different sections are assembled and negotiated by different stakeholders and stitched together at the last minute, the finished document doesn’t even have a single voice.
Part Three of WorldCC’s Adaptive Contracting2 series states the diagnosis about as bluntly as it can be put: contracts have long been designed in a static format aimed at readability and interpretation by a relatively narrow cohort of experts - contract managers and lawyers - and the traditional format remains a far-from-ideal artifact for actually supporting delivery.
So: thousands of obligations, in a document nine out of ten of the people bound by it can’t navigate, written for a proceeding that will almost certainly never happen, in a format its own professional body describes as poorly suited to the job.
That is not a gap problem!
Why more words make it worse
The more words used to describe an obligation, the less clear it becomes, and the further it drifts from anything a delivery manager can act on. A clause that survives a court’s reading and a clause that tells a project team what to do on Tuesday are different artifacts. We keep asking one document to do both jobs, and it does neither well.
WorldCC’s Ten Pitfalls research is blunt about the consequences: many of us deviate from the contract unintentionally simply because it is not easy to use.
When the specification runs to hundreds of items, something worse happens. Everything is mandatory, so nothing is prioritized. The team can’t see the wood for the trees, so they optimize for whatever is easiest to evidence rather than whatever determines success.
So what does AI do to this?
The obvious application is extraction. Ingest every contract, extract every obligation, and load them into a register. That is genuinely useful, and it addresses a real gap - WorldCC found in 2016 that over 60% of organizations lack a coherent contract management application or have the wrong software. That was 2016; the problem has not gone away. WorldCC’s 2022 benchmark study with Malbek, Crossing the Contract AI Chasm,3 found that respondents named obligation tracking as the single biggest point of friction in their organization, ahead of contract development, review and approval - while 53% had not implemented a CLM solution at all and only 38% had implemented AI.
Look at the rest of that friction ranking, and it gets more interesting. Obligations tracking, requirements scope definition, and contract change management take 48% of all choices between them. Negotiation and claims or disputes take 21%.
The activity we pour the most professional effort into, and the outcome we draft hardest to guard against, sit near the bottom of what practitioners say actually causes them trouble. What causes trouble is knowing what you agreed, agreeing what you meant, and handling it when it changes.
So the tooling gap is real, but it raises a critical question. If you are finally going to point good tooling at your obligations, it is worth deciding first whether you want it to find you more of them.
There is a version of AI adoption that will make the underlying problem worse, and it’s the version people are most excited about. Benchmark your contract against everyone else’s, identify the obligations you’re “missing,” and add them. You have used a remarkable tool to industrialize the production of contractual complexity that nobody reads. Longer contract, fuller register, same delivery outcome. Possibly a worse one, because you have added noise to a document that already had too much.
Each side deploys AI agents to micro-manage the details, but are we going to be better off for doing this more quickly?
Tim Cummins has made a version of this point about AI and silos: it can create the joined-up data flows we need for faster and better decisions, but a lot of the use cases now emerging simply replicate traditional siloed functional behavior and reaffirm the compartmentalization instead of breaking it down.
The applications that help point the other way:
- Compression, not expansion. Of these two thousand obligations, which bear on the outcome? Which are boilerplate and box-ticking no one will ever check? What is the milestone or leading indicator that would tell you more than any of them?
- Translation. Take the obligation as drafted and produce the version the delivery lead needs, in their language, with an owner and a date attached. This is not a new idea - WorldCC has been arguing for years that we should design contracts for users, including through graphics, flow charts, apps and video. AI just makes it cheap. Do watch the duplication risk: two versions of the same obligation can drift apart. If you’ve already simplified the contract, this is easier to do and maintain.
There’s a wrinkle here that is new, and that we need to plan for. For thirty years the argument has been that contracts should be designed for the people who have to use them. We now have two readers to design for, and they want different things. Part Three of Adaptive Contracting observes that formatting obligations into tables often adds clarity for a human, but an AI trained on natural language may struggle with columns of text and detailed tables. What serves both is duller and better: plain language, and actual dates rather than “within 30 days of the date of execution”.
- Ownership. An obligation with no named human owner is not an obligation. It’s a hope. Don’t just leave this for the AI agents.
Tim Cummins framed the distinction well in his foreword to that AI study. The real power of AI, he argued, is not replacing human effort or clearing administrative work - it is augmenting human intelligence with insight and capability we had not imagined. That is the difference between using AI to produce more contract and using it to finally understand the one you already have.
The problem you can’t draft your way out of
Contracts are inherently incomplete. What we think at signature and what turns out to be the case will always differ, and the divergence begins the day after signing. This isn’t a practitioner grumble; Oliver Hart won the 2016 Nobel Prize in economics substantially for work on incomplete contracts, a point WorldCC’s own Pitfall 5 research4 picks up.
The 2026 Closing the Procurement Value Gap5 report describes where this shows up. Value leakage occurs after signature, when expectations drift, changes go unmanaged, and performance, obligations and supplier behavior are not monitored. I would add the other half of that sentence: nor is the customer’s own behavior, and the customer’s failures to perform are just as capable of sinking the outcome.
Standard templates, designed for efficiency and to prevent unintended risk, are poorly suited to dynamic supplier arrangements and don’t adapt as markets, technology and regulation move. The report’s own example is the arrival of as-a-Service models, where buyers assumed they could apply their standard Master Services Agreement. A one-size-fits-all contract may look more efficient but is unlikely to be as effective. By design, it is not going to be effective for any particular situation. And with 92% of businesses operating from standard templates that are rarely balanced, this is close to universal.
Forcing a customer’s contract terms onto suppliers may also limit the supplier’s ability to do their best work. Smarter Contracts, Better Margins5 found respondents reporting that legal frameworks often fail to reflect actual delivery models or business goals, with performance risks left inadequately managed as a result - a problem the study says is most frequently highlighted on the buy side. The Value Gap report makes the same point in commercial terms: imposing your own template can itself cause price increases, and it counts that as one of the ways savings are missed. Using, or incorporating, the supplier’s terms should align their obligations with how they will actually deliver the promised outcomes.
Tim Cummins has put the underlying problem more bluntly than any of the reports do. Writing about commercial integration,6 he describes a standardization mindset - standard templates, standard terms, standard processes - that promises efficiency and often delivers the opposite: contention during negotiation, higher prices as suppliers price in onerous terms, and poor performance, because the contract was optimized for legal protection rather than delivery outcomes. Too many standards were set for a different commercial environment and survive because they are embedded in policy, not because they still serve any purpose.
The external environment is changing faster, and organizations need to keep pace. WorldCC found that the need for significant contract revisions during execution has increased by almost 40%.
If your response to incompleteness is always more words, the contract gets heavier and less useful with every revision. WorldCC’s Adaptive Contracting research names the mindset behind that reflex: treating the contract as a legal artifact for allocating risk and recording obligations puts it in a defensive posture - protection rather than performance. Smarter Contracts sets out what the alternative looks like in structural terms, contrasting legacy change management, which it describes as formal, legalistic and slow, with adaptive contracts built around pre-agreed triggers and pathways for adjustment.
Part Three is direct about this too: a problematic legacy of traditional contract thinking is the assumption that certainty and completeness are the goals, when they are rarely achievable. Its answer isn’t more words, it’s a different test. Executability is the mantra - clearly identify obligations, options and conditions; define measurable signals tied to performance or risk; and link contractual provisions to operational actions.
The alternative, then, is to spend a proportionally greater effort on the problem, the opportunity, why it’s urgent, and how the parties will work together when reality departs from the plan. That doesn’t remove the need for good obligations. It makes it possible to tell which ones matter.
Sources
- The 10 Critical Pitfalls of Modern Contract Management (Tim Cummins, 2016; WorldCC members)
- Adaptive Contracting (WorldCC / Accenture, 2026)
- Closing the Procurement Value Gap (WorldCC / Ironclad, 2026)
- Pitfall 5: Negotiations - a source of risk? (IACCM, 2017; WorldCC members)
- Smarter Contracts, Better Margins (WorldCC / CCM Institute / Icertis, 2025)
- Beyond category management (Tim Cummins, Commitment Matters, 2026)
If you'd like to talk through how any of this applies to your contracts, I'm always happy to have a conversation.
This post is part of a series on contract and commercial management I originally wrote for World Commerce & Contracting.